Apr 1, 2010

NEW BEARING FAIL 2 DAYS AFTER INSTALATION CAUSED BY INPROPER BEARING FIT

NEW BEARING FAIL 2 DAYS AFTER INSTALLATION CAUSED BY IMPROPER BEARING FIT.


During power plant annual inspection, PdM department gave a recommendation to replace motor bearing and repair bearing housing dimension. The job was done by third party in a week and a acceptance test (no load condition) was conducted . Vibration spectrum and PV from acceptance test is shown in fig 1.





Fig 1. Vibration spectrum and PV from inboard bearing from acceptance test

The data was taken at 7 July. From vibration spectrum, it was noted some activity at high frequency which usually corresponded to bearing defect, but since it’s magnitude was still lower than acceptance limit criteria it was decided to pass and put it into operation.

9 July , operator reported very high noise from this machine. Vibration spectrum and PV is shown in picture 2



Fig 2. Vibration spectrum and PV after two days in service

It was noted increased noise floor at vibration spectrum and PeakVue. BPFO and BPFI also appear on vibration spectrum. Then it was decided to draw it from service and install new bearing. During inboard bearing disassembly, it was found that bearing housing diameter was 0.5 mm smaller than it should be. Heavily marked path pattern was identified in raceways. The probable cause was smaller dimension of bearing housing make bearing internal clearance get to tight and cause high load at he bearing. This is way the bearing only last for 2 days.

Mar 31, 2010

Dynamic Absorber Aplication on Condensate Pump (Vertical Pump)

Power generation with rated output 400 MW operate two condensate pump to transfer water form condenser hotwell to low pressure heater. Theese pump are 6 stages vertical pump. If one of the pump is out service it would derated 50 % from the design output. The plant operator reported high vibration one of the pump. We were invited to conduct vibration analysis. Figure 1 shows machine diagram and picture :

Figure 1. Machine diagram

Vibration data ( table 1) were taken at motor outboard an inboard bearing.

Vibration

Motor

Pump

mm/s rms

Out

In

In

Out

Horizontal

7.0

2.5

0.8

--

Vertical

1.9

1.3

0.6

--

Axial

0.6

--

0.3

Table 1. Vibration data

From table 1 it was noted that vibration were dominant at horizontal direction ( peroendicular with pump discharge ) and the dominant frequency was at 1x order as shown in figure 2. Amplitude ratio between horizontal and vertical nearly 3 : 1.


Figure 2. Vibration spectrum at Outboard bearing-horizontal

Our hypothesis was we have resonance problem at horizontal direction, bump test also indicated that the pump natural frequency was very close with pump operating speed. To avoid resonance condition we have to move pumps natural frequency but this would cause the pump out service and decreased plant output. The only available option was to install Dynamic Vibration Absorber. This was made form rectangular bar and a mass adjusted to get natural frequency equal with pump natural frequency. Table 3 show vibration amplitude after absorber installation

Vibration

Motor

Pump

mm/s rms

Out

In

In

Out

Horizontal

2.1

0.9

0.6

--

Vertical

1.9

0.9

0.6

--

Axial

0.8

--

0.3

Table 3. Vibration after Absorber istalation


Figure 3. Vibration spectrum after absorber installation

After absorber installation vibration dropped from 7 mm/s to 2.1 mm/s.


Figure 4. Dynamic Vibration Absorber Instalation